H*LD Self Storage Bow – Stage 4 M&E Design Package

Project Details

Client
H*LD Self Storage
Sector
Mechanical & Electrical
Service Type
Commercial / Self Storage
Location
Bow, London
Project Duration
10 Weeks
Project Lead
Design Manager, JR Revell

H*LD Self Storage required a full Stage 4 M&E drawing and performance specification package for a new six-storey self-storage facility in Bow, London. The scheme includes over 1,000 storage units alongside business space with work pods and shared facilities, and needed a coordinated, tender-ready design aligned with planning and BREEAM ‘Outstanding’ requirements.

JR Revell supported the project from Stage 3, advising during concept design before taking responsibility for the full Stage 4 package. The focus was on producing clear, compliant and buildable information within a tight programme, ensuring the design could move straight into tender without delay or ambiguity.

The key challenge was coordination. All systems — electrical, mechanical, renewables, fire and security — needed to integrate fully while meeting current standards and performance requirements. Early decisions around specialist input and system strategy ensured the design was practical to deliver and avoided clashes or gaps that could impact programme later.

JR Revell delivered a complete Stage 4 M&E package, including detailed drawings and performance specifications structured for contractor pricing and construction delivery. All documentation was aligned with BREEAM and planning requirements, with revisions issued promptly following client review.

As a result, H*LD were able to issue a clear and coordinated tender pack, reducing risk at contractor stage and protecting programme from the outset. The design provides a solid foundation for delivery, with systems planned for compliance, performance and long-term use.

This project, the fourth of many for H*LD, reflects JR Revell’s strength in early-stage design — bringing clarity, coordination and practical thinking to ensure projects are set up properly before construction begins.

Building Size: 101,858 ft² (Total) | 69,702 ft² (Storage)

Scope of Works

  • Full Stage 4 M&E design package including coordinated drawings, specifications and tender documentation

Electrical Systems

  • Power distribution, containment, lighting and small power design (Hager, MK, Collingwood)

Mechanical Systems

  • HVAC and ventilation design for occupied areas, including plant selection (Daikin, Systemair)

Fire & Life Safety Systems

  • Fire alarm design integration, cause and effect strategy and system interfaces (Advanced, Apollo)

Security Systems

  • CCTV, access control and intruder alarm system design in line with client and SBD requirements (Hikvision, Paxton, Sensorberg, Pyronix)

Renewables & Energy

  • Rooftop PV integration, metering and energy monitoring strategy (Rayleigh)

Coordination & Compliance

  • Full design coordination with architectural and structural teams
  • BREEAM compliance and performance specification development

 

Project images

Related Projects

H*LD Self Storage Chiswick – Stage 5 M&E Design Package
Bespoke Surface Mounted Lighting Solution
S & L United Storage Systems Solar PV Installation

Testimonials

What We Do

Electrical Services

We’ll map your site’s power needs up front, so you avoid late-stage surprises and keep everything on schedule.

Renewable Energy

When it comes to rooftop solar or EV charging you won’t be left guessing, we’re here to make it part of your sustainability roadmap.

Fire & Security

From alarm panels to CCTV, we engineer fully integrated safety systems that leave no weak spots.

Temporary Services

Tell us where you’re at – we’ll help you get the site powered up and ready to go.

Mechanical & Electrical

Your building needs to perform long after the handover. That’s why we think ahead when we’re designing your M&E setup.

How can we help?

Call us today for a quote
01621 770656

Get a Quote