King’s Cross M&E Fit Out – Self Storage Facility

Project Details

Client
H*ld Self Storage
Sector
Mechanical & Electrical
Service Type
Commercial
Location
King’s Cross, London
Project Duration
6 months
Project Lead
Bryan Stanford

H*ld Self Storage commissioned the conversion of two existing warehouse buildings in King’s Cross, integrating them with an already operational self-storage facility to create a single, fully functioning site. The project combined the three buildings into one cohesive operation, significantly increasing the number of storage units while introducing a new reception and customer areas.

The project location presented an immediate logistical challenge. The site sits on a public road in a busy central London residential area with no available parking or loading space. Managing deliveries, materials and contractor access required careful planning to ensure work could proceed safely without disrupting the surrounding area.

JR Revell were selected to deliver the mechanical and electrical installation owing to our long-standing relationship with H*ld Self Storage and our proven track record of delivering high quality work on time. From the outset, the project required careful coordination between the project team, the principal contractor and the client to manage both the complexity of the building conversion and the logistical constraints of the site.

The scope of works involved delivering a full mechanical and electrical fit out across the development, integrating services across three buildings into one unified system. Electrical installations included lighting, emergency lighting, feature lighting, electrical distribution, small power, fire alarm systems, access control, security systems, solar PV installation, electric vehicle charging infrastructure and lightning protection.

Mechanical services included ventilation, extraction systems, heating and cooling, domestic water services and drainage systems throughout the facility. The works also involved relocating the reception area from one building into another, along with the installation and fit-out of both client and staff kitchen areas.

The project was delivered in a phased manner, allowing different areas of the site to be completed while works continued elsewhere. Close coordination with the principal contractor and the client ensured sections of the building could be isolated where required, allowing work to progress safely and efficiently while maintaining overall programme delivery.

The completed development successfully transformed three warehouse buildings into one fully integrated facility. Structural works included raising one of the building roofs, while the M&E installations created a single coordinated system across the site.

As a result of the conversion, the facility gained an additional 267 storage units along with a relocated reception area and improved customer facilities. JR Revell continues to support the site through ongoing life safety services, reflecting the long-term relationship with the client and our continued involvement in maintaining the building’s operational safety and compliance.

Project images

Related Projects

H*LD Self Storage Chiswick – Stage 5 M&E Design Package
Bespoke Surface Mounted Lighting Solution
S & L United Storage Systems Solar PV Installation

Testimonials

What We Do

Electrical Services

We’ll map your site’s power needs up front, so you avoid late-stage surprises and keep everything on schedule.

Renewable Energy

When it comes to rooftop solar or EV charging you won’t be left guessing, we’re here to make it part of your sustainability roadmap.

Fire & Security

From alarm panels to CCTV, we engineer fully integrated safety systems that leave no weak spots.

Temporary Services

Tell us where you’re at – we’ll help you get the site powered up and ready to go.

Mechanical & Electrical

Your building needs to perform long after the handover. That’s why we think ahead when we’re designing your M&E setup.

How can we help?

Call us today for a quote
01621 770656

Get a Quote