Bespoke Surface Mounted Lighting Solution

H*LD Self Storage required a high quality lighting solution that aligned with the performance standards achieved across previous developments, whilst also meeting the project’s compliance and sustainability requirements. A proven recessed luminaire had previously been used to achieve the required lux levels, lighting uniformity and BREEAM compliance. However, ongoing projects are designed with exposed services […]

Amari Plastics Warehouse Relocation

JR Revell supported Amari Plastics with the electrical design and installation for their relocation into a new warehouse facility in East London. The move involved transferring live production operations from an existing site into a new CAT A unit with only basic electrical infrastructure in place. The challenge was maintaining production throughout the move. Machinery, […]

Electrical Installation Condition Report (EICR) – Commercial Warehousing Site

Commodity Centre Group needed full electrical compliance across a large, fully operational warehousing and logistics site in Great Braxted. The challenge was simple but uncompromising. Every warehouse had to be inspected, tested and certified without disrupting day to day operations. The site consists of fifteen live warehouse units handling goods from across the UK and […]